    Allam Homes - construction of a brick veneer project house, Ballybunnion Terrace, Glenmore Park, N.S.W., Apr-Jul 1998 ; New owners and interior decoration 8 months after completion, Apr 1999 / photographed by Walter Peeters
  • Creator
  • Call number
    PXA 815
  • Level of description
    fonds
  • Date

    Apr-Jul 1998 ; Apr 1999
  • Type of material
  • Reference code
    395067
  • Physical Description
    Photographs - 20.3 x 25.4 cm.-25.4 x 20.3 cm. - 40 silver gelatin photoprints
    Architectural and Technical Drawings - 4 architectural plans (photocopies)
  • Scope and Content
    1-35. Construction of house
    1. Levelling block at Lot 7651, 15 Apr
    2. Drilling holes for concrete piers, 16 Apr
    3. Excavation for slab, showing holes for concrete piers, 17 Apr
    4. Formwork for slab, 20 Apr
    5. Waterproof membrane in place, with plumbing protruding, 23 Apr
    6. Placement of styrofoam blocks over membrane, 24 Apr
    7. Addition of reinforcing to waffle slab, 24 Apr
    8. Waffle slab ready for concrete pour, 25 Apr
    9. Concrete pumper and mixer, pouring slab, 28 Apr
    10-11. Levelling concrete on waffle slab, 28 Apr
    12. Pouring concrete using vibration to reduce bubbles, 28 Apr
    13. Concrete slab curing for 7 days, 6 May
    14. Arrival of prefabricated timber frames, 11 May
    15. Erection of prefabricated frames, 13 May
    16. Timber frames and windows in place, 15 May
    17. Tilers begin roof, 16 May
    18. Roofing completed, 20 May
    19. Detail of timber construction, 21 May
    20. Bricklayers commence, 22 May
    21. Building outside brick walls, 26 May
    22. Bricklayers near completion, 28 May
    23. Installing plasterboard (plumbing detail visible), 1 Jun
    24. Installing plasterboard and insulation, 1 Jun
    25. Plasterboard installation, 2 Jun
    26. Tiling bathroom, 11 Jun
    27. Painting kitchen, 11 Jun
    28. Electrician installing lights, 16 Jun
    29. Plumbers in kitchen installing sink, 17 Jun
    30. Overall view of house, 19 Jun
    31. Carpet layer, 23 Jun
    32. Pouring concrete drive, 26 Jun
    33. Concrete drive with moulding to give impression of individual pavers, 26 Jun
    34. Installing fence around property, 3 Jul
    35. Completed house with letterbox and television aerial, 20 Jul
    36-40. New owners and interior decoration
    36. Owners in front of their new home
    37. Kitchen
    38. Lounge room
    39. Bedroom
    40. Bathroom
    41-44. Allam Homes: Site plan ; Waffle slab plan ; Ribbed raft slab details ; [Site survey]